41 to 50 of 184 Results
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Adobe PDF - 84.4 KB -
MD5: f997de2e0638d5836c0ac110013d646c
|
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Adobe PDF - 752.1 KB -
MD5: 5c1180fae8eb35143a0ef401b7130091
|
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Fixed Field Text Data - 777.2 KB -
MD5: 250b3afefa057f9f4cec36988b45b1d6
|
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Fixed Field Text Data - 777.2 KB -
MD5: da48a81d618aca4729cc496813f8c163
|
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Fixed Field Text Data - 777.2 KB -
MD5: 372c26dbaa71c1959d31e70cbce7ab7a
|
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Fixed Field Text Data - 777.2 KB -
MD5: 020b2c6f94cd2a9397b3ca74e1959285
|
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Fixed Field Text Data - 777.2 KB -
MD5: e7b64b59a7a641cf0505ba9172480d15
|
Nov 28, 2023 -
Two-Way Time (TWT) grids from the Havnsø project
Fixed Field Text Data - 777.2 KB -
MD5: e30361f26187c2a473034c2c6aff977c
|
Nov 21, 2023
Gregersen, Ulrik; Smit, Florian W.H., 2023, "Two-Way Time (TWT) grids from the Stenlille project", https://doi.org/10.22008/FK2/KYVUZQ, GEUS Dataverse, V1
GEUS’ gridded interpretations in two-way time of the Stenlille structure from the CCS2022–2024 project. The grids in two-way time from key seismic horizons of this folder are based on 2D seismic data acquired in 2022 (the GEUS2022-STENLILLE survey) and legacy seismic data and pub... |
Nov 21, 2023 -
Two-Way Time (TWT) grids from the Stenlille project
Adobe PDF - 752.1 KB -
MD5: 5c1180fae8eb35143a0ef401b7130091
|